About Marr Contracting
Marr Contracting (Marr) are world leaders in the design and delivery of heavy lift luffing tower cranes and heavy lifting solutions.
ContractorMarr Contracting (Marr) is an Australian company with offices in London and Leeds in the United Kingdom, specialising in the design and delivery of heavy lift luffing tower cranes and heavy lifting solutions.
With almost 100 years’ experience working on large-scale construction projects in Australia and around the world, Marr has worked on projects in large-scale construction, major transport infrastructure, technology, power generation and renewable energy, mining, oil and gas, high-rise and stadia construction sectors.
Marr’s unique heavy lift fleet includes the world’s largest capacity luffing tower crane, the 330-tonne capacity Favelle Favco M2480D Heavy Lift Luffing (HLL) crane, and the world’s smallest tower crane, the Marr M40R.
[edit] Philosophy
Marr designs innovative cranage solutions and works with contractors to address complex construction and engineering challenges.
By working closely with contractors, Marr aims to find the most efficient, productive and safe cranage solution for the project. The best results are delivered when Marr is consulted early in the front-end engineering design stage of the process.
[edit] Heritage
Marr is a third-generation family-owned and run business.
Founded in 1926, Gordon Robert Marr designed one of Sydney’s first cranes to make it easier for his father’s iron foundry business, E.A. Marr & Son, to transport the heavy parts required to recondition boilers for their client, Colonial Sugar Refinery (CSR).
During the ‘space race’ of the 1950s and 1960s, the company was nicknamed by industry peers as ‘The Men From Marr’s’.
Gordon Ernest Marr took over the company in the early 1970s, instilling a culture of ‘doing things differently’. This was during the same period as Australia’s resources boom, the Sydney 2000 Olympics, and many of the city-shaping projects that Australia is known for.
Gordon Ernest Marr also established Marr’s partnership with crane manufacturer, Favelle Favco.
The third generation started when the current managing director, Simon Marr, took over in 2000. Since he started working in the business at the age of 17, he had worked his way up through the business. Simon has overseen Marr’s expansion into new sectors and international markets, including Southeast Asia, Turkey, the UAE, Latin America and the UK.
Simon’s brother, Gordon John Marr, is technical & product development director.
In 2021, Marr Contracting International opened an office in London and a regional office in Leeds, United Kingdom, in 2024.
Featured articles and news
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building 2024 judges choice winner
Once Upon a Pass by Liam Man.
CIOB Art of Building 2024 public choice winner
Fresco School by Roman Robroek.
HE expands finance alliance to boost SME house building
Project follows on from Habiko public-private place making pension partnership for affordable housing delivery.
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
How orchards can influence planning and development.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.